Rapid Delivery for Amico Brass Mini Ball Valve Export to UK

Rapid Delivery for
 Amico Brass Mini Ball Valve  Export to UK

Short Description:

       


Product Detail

Product Tags

With a sound business credit, excellent after-sales service and modern manufacturing facilities, we have earned an excellent reputation among our customers across the world for Rapid Delivery for Amico Brass Mini Ball Valve Export to UK, Our company maintains safe business mixed by truth and honesty to keep long-term relationships with our customers.


 

2561

 

 

 

  • Previous:
  • Next:



  • 1600mm PE pipe installation saves power supply in Victoria, Australia

    To avert a power supply crisis to the state of Victoria, the urgent diversion of a river through a pipeline needed to be implemented. In early June 2012, the Morwell River surged and a levee collapsed allowing the river to flow directly into the open cut coal mine which supplies the Yallourn power station. The flooding caused US$400m of damage to infrastructure and put the electricity supply to over 1 million homes and businesses at risk.

    With limited coal reserves to keep the power station operational, a rapid response was required to divert the river, dewater the coal mine and reinstate coal supply to the power station. Without the capacity to divert the river the mine would have been closed and the power station shut down. PE100 pipe was the only solution as the project required fast extrusion, large diameters, adaptable installation techniques, high integrity welds, abrasion resistance and flexibility.

    The logistics challenge of pipe delivery was significant. A total of 4km of 1600mm diameter PE100 pipe needed to be priority manufactured at two extrusion sites, one 3,500km away in Western Australia. The 12m lengths of pipe were delivered to the site one at a time by truck. Large diameter pipe welding equipment was air freighted from the USA and commissioned using destructive testing techniques.

    The around-the-clock pipeline installation involved welding ten lengths of pipe into 120m strings which were then dragged to the installation site for final joining. The tie-ins were complete and the pipeline was commissioned in time to keep the power station operating. The entire Morwell River was then flowing through the pipeline allowing repair of the mine infrastructure to begin. Two years later, the pipeline is still in service securing the long-term supply of power to Victoria.



    Zhangjiagang Techno Machinery Co.,Ltd. is specialized in manufacturing and exporting different kinds of plastic extrusion and plastic recycling machinery.
    Web: https://www.technomachinery.com
    Contact: Ms.Crystal Ren
    Email: extrusion@technomachinery.com

    Write your message here and send it to us
    WhatsApp Online Chat !